RF Terminal: RFP- Engineering Study, 1977 May
Correspondence related to proposed study on the effects of tall building's roof rotations and translations caused by temperature, wind and load, in creating antennae pointing error. Includes statement of work for study; proposal response and company biography with project and client list of Edwards & Hjorth, structural engineering consultancy.
RF Terminal: RFP- Evaluation, 1977 August
Includes memoranda concerning planning and organization for evaluation process; summaries and comparisons of proposals evaluated on proposed exceptions from terms and conditions, cost summaries, adherence to technical specifications; summaries of bidder proposals and ranking of bids.
RF Terminal: RFP- Funding Authority, 1976 November
RF Terminal: RFP- Requests for Information, 1977 March
Letters from SBS to companies requesting technical information to assist in preparation of the RF Terminal RFP.
RF Terminal: RFP- Responses, 1977 August
Cover letters for proposals from Comtech, GTE, Hughes Aircraft Company, NEC America, Inc., Rockwell International, and others.
RF Terminal Operation and Maintenance Handbook, Volume III- Low Noise Amplifier, 1981
Handbooks contain descriptions of systems; schematics, component and circuit diagrams; operational instructions; general theory of operations; maintenance and troubleshooting guides.
RF Terminal Operation and Maintenance Handbook, Volume IV- High Power Amplifier, 1981
RF Terminal Operation and Maintenance Handbook, Volume V- Up and Down Converter System, 1981
RF Terminal Operation and Maintenance Handbook, Volume VI- Monitor & Control Subsystem, 1981
RF Terminal Operation and Maintenance Handbook, Volume VII- Power & Support Equipment, 1981
RF Terminal Operation and Maintenance Handbook, Volume VIII- Schematic Diagrams & Wire Run Lists, Part 1, 1981
RF Terminal Operation and Maintenance Handbook, Supplement- Dual Shelter Configuration, 1981 November
RF Terminal Operations: Administrative Notes, 1978 September-1980 March
Includes facility planning, logistic and delivery schedules for RFT components; site installation schedules; SBS responsibilities under RFT contracts; correspondence and memoranda concerning program milestones and progress.
RF Terminal Operations: NEC Monthly Progress Reports, 1982 January-1982 February
Includes summaries of manufacturing, shipping and installation status; installation status by site; facilities technical bulletins with updates on technical and installation specifications.
RF Terminal Operations: NEC Post-Contract Correspondence, 1981 June
Correspondence between SBS Systems Procurement department, NEC America, Inc. and others concerning construction and installation of RFTs at customer premises. Includes punch lists for various customer sites; installation team expense and equipment quotes; site surveys, installation plans and modifications; delivery and installation scheduling matters; equipment and component lists.
RF Terminal Operations: NEC Post-Contract Correspondence, 1981 October-1982 June
Correspondence concerning installation schedules and maintenance issues for Port Adapter System and other RF Terminal systems; summaries of equipment orders and related correspondence; lists of repaired components; records related to SBS RFP for a Data Collection and Administrative Service for its message service network.
RF Terminal Operations: NEC Post-Contract Correspondence, 1982 October-1982 December
Includes maintenance and repair reports; warranty status reports of components, including TWTs with serial numbers of all TWTs in use; reports on meetings of Change Implementation Planning Group, includes summaries of current work orders and repair tickets; terminal configuration reports including warranty information, location address and antennae size; antennae installation schedules and inventories.