Survey and Map Work, 1912 March 25

 File — Box: 66, Folder: 1
Accession: 1982-300Identifier: 1982-300-CLX.
Scope and Contents note:

Map of Repauno Works Scale 1 Inch is 100 Feet. Photographs by J. L. Warner

Dates: 1912 March 25

Machines, 1912 April 1

 File — Box: 66, Folder: 2
Accession: 1982-300Identifier: 1982-300-CLX.
Scope and Contents note:

Kimber Machine, Packing Machine, Hall Machine, Hall Punching Machine, Hall Punching House, Box Printing Machine, Shell Machine.

Dates: 1912 April 1

Laboratory #7, 1912 May 22-1912 July 31

 File — Box: 66, Folder: 3
Accession: 1982-300Identifier: 1982-300-CLX.
Scope and Contents note:

Extension, Eastern Laboratory Building #7. Photographs by J. L. Warner

Dates: 1912 May 22-1912 July 31

Filling Meadows with Material, 1912 May 27-1912 June

 File — Box: 66, Folder: 4
Accession: 1982-300Identifier: 1982-300-CLX.
Scope and Contents note:

Material Dredged from the Delaware River, Showing Extent of Fill Along River Bank, Eastern Laboratory Power Testing Building. Photographs by J. L. Warner

Dates: 1912 May 27-1912 June

Triton Finishing House Fire and Explosion, 1912 June 14

 File — Box: 66, Folder: 5
Accession: 1982-300Identifier: 1982-300-CLX.
Scope and Contents note:

Views Showing Ruins after Fire and Explosion Also Various Other Views about the Trition Finishign House Taken at Time of Fire. Photographs by J. L. Warner

Dates: 1912 June 14

Shops, 1912 July 1-1915 July 31

 File — Box: 66, Folder: 6
Accession: 1982-300Identifier: 1982-300-CLX.
Scope and Contents note:

Changes to Drives Millwright Shop with New Motor House-10 H. P. Motor on First Floor, Electrician Shop, Carpenter Shop, Pipe Shop, Foundation Pipe Shop. Photographs by J. L. Warner

Dates: 1912 July 1-1915 July 31

Locomotive Crane Hoisting, 1912 July 31

 File — Box: 66, Folder: 7
Accession: 1982-300Identifier: 1982-300-CLX.
Scope and Contents note:

Locomotive Crane Hoisting and Hauling Equipment with Crane Equipped for Broad Gauge, Locomotive Crane Hoisting and Hauling Equipment with Unloading Crane. Photographs by J. L. Warner

Dates: 1912 July 31

Solvent Recovery, 1912 July 31-1913 April 30

 File — Box: 66, Folder: 8
Accession: 1982-300Identifier: 1982-300-CLX.
Scope and Contents note:

Solvent Recovery Apparatus Building, Solvent Recovery House Fire of 1913 April 22, Solvent Recovery Condition of Apparatus After Fire of 1913 April 22, Solvent Recovery House After Fire of 1913 April 22, Weigh Tank from Solvent Recovery Found in Delaware River after Fire of 1913 April 22, End of Solvent Recovery Weigh Tank Founda in O. V. #2 after Fire 1913 April 22, Solvent Recovery Found after Fire of 1913 April 22, Top of Solvent Recovery Still Found East of Triton Storehouse after Fire of 1913 April 22, New Solvent Recovery Building Framing Erected and Sheathing Partly Applied. Photographs by J. L. Warner

Dates: 1912 July 31-1913 April 30

Air Compressor, 1912 November 2-1913 February 1

 File — Box: 66, Folder: 9
Accession: 1982-300Identifier: 1982-300-CLX.
Scope and Contents note:

Additional. Photographs by J. L. Warner

Dates: 1912 November 2-1913 February 1

Additional Box Packing House, 1913 February 1

 File — Box: 66, Folder: 10
Accession: 1982-300Identifier: 1982-300-CLX.
Scope and Contents note:

Southwest Corner of Building, Interior. Photographs by J. L. Warner

Dates: 1913 February 1

Views, 1913 March 18

 File — Box: 66, Folder: 11
Accession: 1982-300Identifier: 1982-300-CLX.
Scope and Contents note:

Map of Land West of Magazines, View from Repauno, View from Repauno Across Delaware, Planting #2. Photographs by J. L. Warner

Dates: 1913 March 18

Engine House, 1913 March 8-1913 April 23

 File — Box: 66, Folder: 12
Accession: 1982-300Identifier: 1982-300-CLX.
Scope and Contents note:

Framing Steam Locomotive Side and Fire Wall Partially Completed, Showing Framing of Gasoline Locomotive Aside Also Fire Wall, Complete Except for Tracks and Heating. Photographs by J. L. Warner

Dates: 1913 March 8-1913 April 23

Gelatine Capacity, 1913 April 30

 File — Box: 66, Folder: 13
Accession: 1982-300Identifier: 1982-300-CLX.
Scope and Contents note:

Increased Gelatine Capactiy Kimber House Barricade Erected and Partly Filled, Wheeling Walk and Increased Gelatine Capacity "C" Line Complete, Increased Gelatine Capacity "C" Line Sheathing Partly Applied, Increased Gelatine Capacity New Tram Track Embankment Near Cartridge House. Photographs by J. L. Warner

Dates: 1913 April 30

Gelatine Dope House, 1913 April 30-1913 October 30

 File — Box: 66, Folder: 14
Accession: 1982-300Identifier: 1982-300-CLX.
Scope and Contents note:

Gelatine Dope Screening House "C" Line, "C" Gelatine Dope House. Photographs by J. L. Warner

Dates: 1913 April 30-1913 October 30

Gelatine Mixing House, 1913 April 30-1913 December 8

 File — Box: 66, Folder: 15
Accession: 1982-300Identifier: 1982-300-CLX.
Scope and Contents note:

Gelatine Mixing House "C" Line Framing Erected and Sheathing Partly Applied"C" Line Gelatine Mixing House #176 After Explosion of 1913 September 22, "C" Gelatine Mixing House View Looking East, "C" Gelatine Mixing House View Looking North, "C" Gelatine Mixing and Heater and Dope Houses View Looking Southwest, "C" Gelatine Mixing and Heater and Dope Houses View Looking Northwest, New Gelatine Mixing House and Heater House and Dope House Panoramic View, Interior of Barricade Building #539 "C" Gelatine Mixing House, Gelatine Mixing Machine, Gelatine Mixing House Barricades. Photographs by J. L. Warner

Dates: 1913 April 30-1913 December 8

Nitric Acid Capacity, 1913 November 25-1914 June 26

 File — Box: 66, Folder: 16
Accession: 1982-300Identifier: 1982-300-CLX.
Scope and Contents note:

Additional Nitric Acid Capacity View of North Side of Building, Additional Nitric Acid Capacity View of South Side of Building, Nitric Acid Capacity #5 Acid Circulating Tanks with Nitric Acid House #5 in the Background, Nitric Acid Capacity #5 Nitre Cake Shed with South View of Nitric Acid House #5 Showing Nitre Cake Shed, Nitric Acid Capacity #5 View from West End of Nitric Acid Plant. Photographs by J. L. Warner

Dates: 1913 November 25-1914 June 26

Cap Magazine, 1914 October 12

 File — Box: 66, Folder: 17
Accession: 1982-300Identifier: 1982-300-CLX.
Scope and Contents note:

Building #51, Building #91. Photographs by J. L. Warner

Dates: 1914 October 12

Diphenylamine Plant, 1914 November 14-1915 July 31

 File — Box: 66, Folder: 18
Accession: 1982-300Identifier: 1982-300-CLX.
Scope and Contents note:

House, Plant Superheater, Plant Digester and Wash House, Plant Hydrochloric Acid Building, Plant Reducer House #1, Plant Distillation and Settling House, Plant Rebuilding Reducer House #1, Plant Digester House #2, Plant Final Still House, Plant Wash House. Photographs by J. L. Warner

Dates: 1914 November 14-1915 July 31

Reducer House and Boiler House, 1914 November 17-1917 March 26

 File — Box: 66, Folder: 19
Accession: 1982-300Identifier: 1982-300-CLX.
Scope and Contents note:

Photographs by W. M. Ralston, J. L. Warner

Dates: 1914 November 17-1917 March 26

Digester and Wash House, 1914 November 17

 File — Box: 66, Folder: 20
Accession: 1982-300Identifier: 1982-300-CLX.
Scope and Contents note:

Photographs by J. L. Warner

Dates: 1914 November 17

Concentrating Equipment, 1915 January 7-1915 July 31

 File — Box: 66, Folder: 21
Accession: 1982-300Identifier: 1982-300-CLX.
Scope and Contents note:

Additional Concentrating Equipment for Sulphuric and Nitric Acids, Nitric Acid Recovery #2, Sulphuric Recovery with Circulating Tanks, Scale Tanks, Interior of Sulphuric Acid Recovery, Concentrating Acid Outlet, Addition to Waste Acid Tower. Photographs by J. L. Warner

Dates: 1915 January 7-1915 July 31

Acid Tank Cars, 1915 March 18

 File — Box: 66, Folder: 22
Accession: 1982-300Identifier: 1982-300-CLX.
Scope and Contents note:

Safety Platform and Railing, Bridge in Vertical Position, Bridge in Horizontal Position, Bridge Being Lowered, End View of Bridge in Horizontal Position. Report by L. A. DeBlois. Photographs by J. L. Warner

Dates: 1915 March 18

Ammonia Gas Plant, 1915 May 3-1915 September 2

 File — Box: 66, Folder: 23
Accession: 1982-300Identifier: 1982-300-CLX.
Scope and Contents note:

Ammonia Gas Plant, Storage Tank and Dust Catcher, Front of Boilers, Top of Autoclaves, Storage Tank and Filter, Main Gas Line to Blower, End of Silo. Photographs by J. Rodney Gause, J. L. Warner

Dates: 1915 May 3-1915 September 2

Tank Car, 1916 April 25

 File — Box: 66, Folder: 24
Accession: 1982-300Identifier: 1982-300-CLX.
Scope and Contents note:

Manufactured by Commercial Acid Company. Photographs by J. L. Warner

Dates: 1916 April 25

O. V. Plant #3, 1915 July 31

 File — Box: 66, Folder: 25
Accession: 1982-300Identifier: 1982-300-CLX.
Scope and Contents note:

Installation of Spray Catchers at O. V. Plant #3, Pyrites at O. V. #3. Photographs by J. L. Warner

Dates: 1915 July 31

Storage of Nitrate of Soda, 1915 July 31-1915 August 26

 File — Box: 66, Folder: 26
Accession: 1982-300Identifier: 1982-300-CLX.
Scope and Contents note:

Additional Storage of Nitrate of Soda. Photographs by J. L. Warner

Dates: 1915 July 31-1915 August 26

Increased Boiler Capacity, 1915 August 26

 File — Box: 66, Folder: 27
Accession: 1982-300Identifier: 1982-300-CLX.
Scope and Contents note:

and Outside Steam Lines, Addition to Building. Photographs by J. L. Warner

Dates: 1915 August 26

Nitrate of Ammonia House Explosion, 1916 January

 File — Box: 66, Folder: 28
Accession: 1982-300Identifier: 1982-300-CLX.
Scope and Contents note:

Explosion Nitrate of Ammonia Evaporating House at Crystallizing Plant, Nitrate of Ammonia House Explosion. Photographs by J. L. Warner

Dates: 1916 January

Explosion at Triton Plant, 1916 May 15

 File — Box: 66, Folder: 29
Accession: 1982-300Identifier: 1982-300-CLX.
Scope and Contents note:

Photographs by J. L. Warner

Dates: 1916 May 15

Fence and Path, 1916 December 31

 File — Box: 66, Folder: 30
Accession: 1982-300Identifier: 1982-300-CLX.
Scope and Contents note:

Photographs by J. L. Warner

Dates: 1916 December 31

Building of Manufacturing Coumaron, 1917 April 24

 File — Box: 66, Folder: 31
Accession: 1982-300Identifier: 1982-300-CLX.
Scope and Contents note:

Destroyed by Fire of 1917 April 23.

Dates: 1917 April 24

Suction Filter

 File — Box: 66, Folder: 33
Accession: 1982-300Identifier: 1982-300-CLX.
Scope and Contents note:

Installation Suction Line, Suction Filter #2 (1 Cyanotype).

Dates: 1903-1987; Majority of material found within 1903-1945

Project 13624, 1928 September 6-1929 September 1

 File — Box: 66, Folder: 34-35
Accession: 1982-300Identifier: 1982-300-CLXI.
Scope and Contents note: Concrete Mixing Plant- Chemical Building Excavation and Factory Building Area and Fill for Reservoir Dam, Fill for Reservoir Dam Looking West, Excavation for Chemical Building Foundations Looking North, North Side of Factory Area, North Side of Factory Area Looking North West, Sanitary Sewer Manhole "L" Looking North, Southeast Corner of Factory Area Looking South from Concrete Plant, Combined Shops and Storehouse Looking Northwest, Fill for Road at Wet End of Factory Area Lookig North, Concrete Material Storage and Mixing Plant, Plant Fence South of Factory, Caustic and Wood Pulp Storage Excavation for Foundatios, Concrete Aggregate Storage, South Side of Factory Area, Chemical Buiding Foundations, South Lateral Sanitary Sewer, North Lateral Sanitary Sewer, Laying 72 Inch Storm and Process Sewer Between Manholes "L" and "E", Storm and Process Sewer Excavation between Headwall and Manhole "P" Looking West, Pouring Concrete for Intake Tower at Reservoir Dam, Combined Shops, Chemical Building Forms, West End Factory Building and Foundations for Wash and Bleach, Factory Area, Excavation for Coagulating Bath Pit, Chemical Building Pouring Fifth Floor, Excavation for Power House, Chemical Buiding Fifth Fllor, Coagulating Bath Pit, Placing Reinforcing for Septic Tank Cover, 72 Inch Storm and Process Sewer, Headwall at East End of 72 Inch Storm and Process Sewer, Excavation for Fitler Plant, Structural Concrete Completed for Chemical Building, Shoring Placed in Excavation 72 Inch Storm and Process Sewer, Erection of Steel Completed in Coagulating Bath, From South Center of Factory Looking Northwest Over Spinning Room Area, Completed Excavation for Filter Plant, Erection of Forms for Filter Plant, Excavation for Power House, General View Looking Southeat from Chemical Building, Method of Testing 72 Inch Segmental Black Tile Sewer, Factory Building Steel, Forms Completed for Foundation Walls at Reservoir Pump House, Driving Construction Pile at Side of James River Pumping Station, Throwing Room Steel Erection, Spinning Room and Carrier Storage Steel, Erecting Forms for Power House Retaingin Wall, Erection of 100,000 Gallon Water Tank, Wood Pulp Storage and Caustic Storage and Chemical Building, Forms Completed for Water Basin of Fitler Plant, Northside of Factory Building, Footing for Power House Retaining Wall, Completing Construction of Reservoir Pump House, Reservoir Pukp House Foundation and Steel Complete, Power House Stack Construction, Construction of...
Dates: 1928 September 6-1929 September 1