Box 33

 Container

Contains 33 Results:

Benzidine, 1919 December 3-1920 October 8

 File — Box: 33, Folder: 13
Accession: 1982-300Identifier: 1982-300-XLVI.
Scope and Contents note:

Installation Safety Chute from Landing on Third Floor of Benzidine Plant #1204 Minor Construction, Minor Construction 1185 Purchase and Installation of Jacketed Sulphonator in Benzidine Building, Safranine Plant Install of REducer System for Production of Benzidine Left of Picture Building Being Used for Installtion of Reducer System for PRoduction of Benzidine Right of Picture Building Being Used in the Installation of Equipment for Safranine Plant. Photographs by J. E Griffith, H. F. Webb

Dates: 1919 December 3-1920 October 8

Diamine House, 1919 December 11-1920 October 8

 File — Box: 33, Folder: 14
Accession: 1982-300Identifier: 1982-300-XLVI.
Scope and Contents note:

Minor Construction of Tubs and Motor in Diamine House, Extension Diamine House Showing New Extension Completed. Photographs by H. F. Webb

Dates: 1919 December 11-1920 October 8

Consolidated Shops, 1920 February 18-1920 August 27

 File — Box: 33, Folder: 15
Accession: 1982-300Identifier: 1982-300-XLVI.
Scope and Contents note:

Showing Steel Work for Machine Shop Bay in Place, Showing Steel Work for Machine Shop One Bay and a Half Completed Also Shows Tile Work and Roofing Partially Completed, Showing Four Bays of Consolidated Shops Compleed with Fifth Under Construction, Showing All Bays Completed with the Exception of Electrical Shop which Shop was about 50% Completed at the Time Picture was Taken, Showing the Last Bay of Consolidated Shops Completed and Ready for Operating Force.

Dates: 1920 February 18-1920 August 27

Standardization Laboratory, 1920 February 18

 File — Box: 33, Folder: 16
Accession: 1982-300Identifier: 1982-300-XLVI.
Scope and Contents note:

Showing Progress of Brick Work on Building at the time Picture was Taken .

Dates: 1920 February 18

Reducer House, 1920 March 3-1920 April 26

 File — Box: 33, Folder: 17
Accession: 1982-300Identifier: 1982-300-XLVI.
Scope and Contents note:

Addition Showing Excavation Made to Recieve Form and Piling Driven in Place, Showing Progress of brick Work in the Construction of Reducer House Addition, Showing Kettle in the Act of being Hoisted to Concrete Piers.

Dates: 1920 March 3-1920 April 26

Anthranilic Acid Recovery, 1920 March 15-1920 June 2

 File — Box: 33, Folder: 18
Accession: 1982-300Identifier: 1982-300-XLVI.
Scope and Contents note:

Anthranilic Acid Recovery and Purification Showing Forms Completed and in Place Waiting for Concrete to be Poured, Anthranilic Acid Recovery and Purification Picture Shows Building 75% Completed in the Foreground and Shows Steel Work of Recovery of Potash for Mixed Carbonate in the Left Background, Anthranilic Acid Recovery and Purification and Recovery of Potash from Mixed Carbonates Showing Anthranilic Acid Recovery and Purification Building about 50% Completed Recovery of Potash from mixed Carboantes Building Steel Work Completed. Photographs by H. F. Webb

Dates: 1920 March 15-1920 June 2

Anthraquinone, 1920 March 31-1920 April 10

 File — Box: 33, Folder: 19
Accession: 1982-300Identifier: 1982-300-XLVI.
Scope and Contents note:

Semi-Works Equipment for Anthraquinone Showing Forms in Place Ready to Recieve Concrete for Foundations, Semi-Works Equipment for Anthraquinone Showing Preparations being made for ouring Concrete in Foundation Forms, Semi-Works Equipment Anthraquinone Showing Foundations Being Poured on this Project. Photographs by H. F. Webb

Dates: 1920 March 31-1920 April 10

Recovery of Potash from Mixed Carbonates, 1920 March 31-1920 July 16

 File — Box: 33, Folder: 20
Accession: 1982-300Identifier: 1982-300-XLVI.
Scope and Contents note:

Showing Forms Completed for Building Foundation, Showing Steel Work on this Building 75% Erected, Showing Building Completed Sufficient for Operating. Photographs by H. F. Webb

Dates: 1920 March 31-1920 July 16

Anthracine, 1920 April 19-1920 July 16

 File — Box: 33, Folder: 21
Accession: 1982-300Identifier: 1982-300-XLVI.
Scope and Contents note:

Drying and Storage Equipment Showing Building Foundations Poured A and E Foundations Poured Complete Now Erecting Form for Building Walls, Drying and Storage Equipment Showing Wall Forms Stripped from Building and Roof Trusses in Place, Drying and Storage Equipment Showing Exterior of Building Completed with the Exception of Lower Window Frames Johns Mansville's Men Engaged in Laying Roofing at Time Picture was Taken. Photographs by H. F. Webb

Dates: 1920 April 19-1920 July 16

Zinc Oxide, 1920 April 22-1920 June 11

 File — Box: 33, Folder: 22
Accession: 1982-300Identifier: 1982-300-XLVI.
Scope and Contents note:

Calcination of Zinc Oxide Showing Frame Work of Building and Farms Set Ready to Recieve Concrete, Calcination of Zinc Oxide Showing This Job in a Completed State. Photographs by H. F. Webb

Dates: 1920 April 22-1920 June 11

Mixers, 1920 April 30

 File — Box: 33, Folder: 23
Accession: 1982-300Identifier: 1982-300-XLVI.
Scope and Contents note:

Installtion of One Mixer in Ball Mill House Showing Mixer in Operation, Purchase and Installtion of Three Mixers Grinding and Mixing House Showing Mixer Set in Place on Concrete Piers and Complete with the Exception of Transmission. Photographs by H. F. Webb

Dates: 1920 April 30

Sodium Acetate, 1920 May 19-1920 July 16

 File — Box: 33, Folder: 24
Accession: 1982-300Identifier: 1982-300-XLVI.
Scope and Contents note:

Spray Tower for Crystallizing Sodium Acetate Showing Foundations Completed Frame work for Structure up to Second Story, Spray Tower on Crystallizing Sodium Acetate Showing Framing of building Complete Brick Work on Drying Towers Complete, Spray for Crystallizing Sodium Acetate Showing Building Completed and Ready for Installation of Apparatus. Photographs by H. F. Webb

Dates: 1920 May 19-1920 July 16

Essential Materials Warehouse, 1920 June 11-1939 October 25

 File — Box: 33, Folder: 25
Accession: 1982-300Identifier: 1982-300-XLVI.
Scope and Contents note:

Showing Excavations Being Made for Foundation Walls on This Project, View of Essential Materials Warehouse Looking South Showing Forms Set for First Pouring of Second Bay Also Shows Foundations Completed for Third Bay and Excavatoins Made for Entire Building Broad Gauge Track Completed up to This Building, Showing Warehouse Approximately 75% Completed Working on Roof at Time Picture was Taken. Report by O. R. Ames. Photographs by H. F. Webb, J. A. DeLuca

Dates: 1920 June 11-1939 October 25

Filters, 1920 June 18-1920 October 8

 File — Box: 33, Folder: 26
Accession: 1982-300Identifier: 1982-300-XLVI.
Scope and Contents note:

Additional Filter Capacity Showing Excavation for Sedimentation Tank and Pump House About 80% Completed, Additional Filter Capacity Showing Pile Drivers at Work Driving Piles of Which %5 have been Driven on August 13 1920 on Project, Filter Cloth Wash House, Additional Filter Capacity Showing Concrete Sedimentation Tank PRactically Completed with the Exception of Pipe Work. Photographs by H. F. Webb, J. E. Griffith

Dates: 1920 June 18-1920 October 8

Refrigeration Plant Equipment, 1920 June 18-1920 July 16

 File — Box: 33, Folder: 27
Accession: 1982-300Identifier: 1982-300-XLVI.
Scope and Contents note:

Showing Building Addition 75% Complete, Showing Building Addition 95% Complete this Period. Photographs by H. F. Webb

Dates: 1920 June 18-1920 July 16

Garage, 1920 June 25-1937 April 26

 File — Box: 33, Folder: 28
Accession: 1982-300Identifier: 1982-300-XLVI.
Scope and Contents note:

Brick Garage and Frame Buliding Showing This Building about 50% Completed, Brick Garage and Frame Buliding Building Completed with the Exception of Wiundow and Corrugate Iron Concrete Floor Poured During This Period, Garage Extension, Garage Addition, Main Garage Addition. Report by O. R. Ames. Photographs by H. F. Webb, J. A. DeLuca

Dates: 1920 June 25-1937 April 26

Dimethylanline Building, 1920 June 25-1920 October 8

 File — Box: 33, Folder: 29
Accession: 1982-300Identifier: 1982-300-XLVI.
Scope and Contents note:

Showing Upright Girders in Place Also Part of the Equipment Set, Showing Building Practically Completed, Showing Structural Iron Work in Place and Concrete Forms Set to Second Floor Level to Recieve Concrete. Photographs by H. F. Webb

Dates: 1920 June 25-1920 October 8

Napthalene Purification Plant, 1920 October 8-1940 July 31

 File — Box: 33, Folder: 30
Accession: 1982-300Identifier: 1982-300-XLVI.
Scope and Contents note:

Napthalene Purification Plant Showing Concrete Being Poured for Walls of Napthalene Storage Bin, Purification of Napthalene with Sodium Superstructure and Tank Farm. Photographs by H. F. Webb, H. S. Stanton

Dates: 1920 October 8-1940 July 31

Ponsol Laboratory, 1927 February 22-1941 July 21

 File — Box: 33, Folder: 31
Accession: 1982-300Identifier: 1982-300-XLVI.
Scope and Contents note:

Ponsol Laboratory, Laboratory Ponsol Color Area,Additions to Ponsol House #2 Building #770, Additional Brine Refrigeration Ponsol House #2. Photographs by E. L. Rich, J. A. DeLuca, H. S. Stanton

Dates: 1927 February 22-1941 July 21

Dust Catcher, 1927 February 22-1927 March 12

 File — Box: 33, Folder: 32
Accession: 1982-300Identifier: 1982-300-XLVI.
Scope and Contents note:

Single Element. Photographs by E. L. Rich

Dates: 1927 February 22-1927 March 12

Dye Storage, 1927 August 15-1936 April 1

 File — Box: 33, Folder: 33
Accession: 1982-300Identifier: 1982-300-XLVI.
Scope and Contents note:

Storehouse for Finished Dyes Shows West End and South End Also New Air Line and Interior, Crude Dye Storage, Finished Dye Storage, Storehouse for Finished Dyes Addition, Additional Storage for Finished Dyes. Report by O. R. Ames. Photographs by E. L. Rich, F. M. Porch, J. A. DeLuca

Dates: 1927 August 15-1936 April 1

Sulphur Colors, 1919 September 11-1937 September 30

 File — Box: 33, Folder: 1
Accession: 1982-300Identifier: 1982-300-XLVI.
Scope and Contents note:

Monochlorbenzol Storage Sulphur Black Area, Addition Trackage and Storage and Shipping For Sulphogene Black, Refrigeration for Sulphur Blue, Additional Trackage and Storage and Shipping for Sulphogene Black Showing Inside View of One Wing of O. P. A. House #1 The Concrete Floor is Complete, Drying Equipment for Sulphur Black Showing Foundation Forms in Place Ready to Recieve Concrete at Sulphur Black, Drying Euipment for Sulphur Black Showing Front View of Building Erected on this Project to House Drying Equipment, Refrigeration Plant Equipment Addition to Sulphur Blue Refrigeration Plant Showing Foundation Forms Being Set and Made Ready to Recieve Concrete, Sulphur Color Building Showing Foundations Completed and Brick Work Completed up to Second Floor of Building, Addition to Sulphur Color Building Showing West View of New Addition to Sulphur Color Building, Sulphur Black House,Sulphur Black Plant. Photographs by J. E. Griffith

Dates: 1919 September 11-1937 September 30

Employee Bulidings, 1919 September 11-1941 May 29

 File — Box: 33, Folder: 2
Accession: 1982-300Identifier: 1982-300-XLVI.
Scope and Contents note:

Roads, Permanent Fire Headquarters, Remodeling 108 Bungalows Shows Typical Bungalow Completed, New Plant Entrance and Employment Office, Gate House, Rubber Laboratory R-8, M. V. A. Building #811. Photographs by J. E. Griffith, H. S. Stanton, E. L. Rich

Dates: 1919 September 11-1941 May 29

Picric Acid Storage, 1919 September 11-1920 March 3

 File — Box: 33, Folder: 3
Accession: 1982-300Identifier: 1982-300-XLVI.
Scope and Contents note:

Showing Inside View, Showing Effects of Crack in South Wall of Picric Acid Storage Through Which M=the Material is Slowly Oozing to Outside.

Dates: 1919 September 11-1920 March 3

Steam and Air Lines, 1919 September 11-1919 November 10

 File — Box: 33, Folder: 4
Accession: 1982-300Identifier: 1982-300-XLVI.
Scope and Contents note:

Changes in Steam and Air Lines Showing Steam and Air and Gas Lines Which Will Have to be Moved to Proper Height of 15 Foot to Allow a Safe Clearance Present Clearance 9 Foot 4 Inches, Changes to Steam and Air Lines Showing the Steam Line Which was Constructed OVer the Broad Gauge Track Along Side of the Gas Line Which Runs to the Sodium Sulphide House. Photographs by J. E. Griffith

Dates: 1919 September 11-1919 November 10

Water Works, 1919 September 12-1934 September 28

 File — Box: 33, Folder: 5
Accession: 1982-300Identifier: 1982-300-XLVI.
Scope and Contents note:

Additional Ice Making Capacity,Additional Raw Water Supply Showing Installation of a Pump at the Wharf, Temporary Water Supply Beetle Creek Shows Pumphouse and 10 Inch Suction Line and Overgrown Pipe Line. Report by O. R. Ames. Photographs by F. M. Porch, J. E. Griffith, E. L. Rich

Dates: 1919 September 12-1934 September 28

Offices and Administration, 1919 September 12-1941 February 19

 File — Box: 33, Folder: 6
Accession: 1982-300Identifier: 1982-300-XLVI.
Scope and Contents note:

Main Office, Main Office Showing the Brick Work Completed and the Roof Being Put on, Main Office Slate Roof Complete Cornice Complete Drain Pipes Erected as Shown in Picture Note that the Windows are Installed Working on Plastering on the Inside, Main Office Showing Completed Main Office Building, Addition Telephone Exchange in Administration Building 441, Interior Office and Laboratory.

Dates: 1919 September 12-1941 February 19

Semi-Works Plant, 1919 October 18-1936 July 27

 File — Box: 33, Folder: 7
Accession: 1982-300Identifier: 1982-300-XLVI.
Scope and Contents note:

Semi-Works Color Plant #1 Showing the Pouring of Concrete on Semi-Works Color House #2 The Ground in the Background is broken for #1 House The Houses in the Background all had to be Moved to their Present Location, Semi-Works Color Plant #2 Showing the Completion of the Foundation and the Beginning of the brick Work Technical Laboratory Shown in the Background, Semi-Works Color Plant #2 View Taken from the Technical Laboratory Steel Work for Second Floor in Place Working on Forms for Pouring Concrete Floors, Semi-Works Color Plant #1 Brick Work Complete up to the Second Floor, Semi-Works Color Plant #3 Showing Stripping of the Forms Which has just been Started from the Concrete Foundations, Semi-Works Color Plant Still House Showing Foundations in Place of the Small Semi-Works Building, Semi-Works Color Plant #2 Showing Close up View of Completed Building with Tile Roofing Placed on All Four Bays, Semi-Works Plant #1 Showing Progress of Work on this Project, Semi-Works Plant and Still House Showing Progress Made on Semi-Works Still House Brick Work Completed to Top of Windows Second Floor, Semi-Works Color Plant and Still House Showing All Building Work Practically Completed on Distillation House, Additional Storage for Semi-Works Area, Storage Facilities. Report by O. R. Ames. Photographs by J. E. Griffith, H. F. Webb, J. A. DeLuca

Dates: 1919 October 18-1936 July 27

Tank Car, 1919 October 28

 File — Box: 33, Folder: 8
Accession: 1982-300Identifier: 1982-300-XLVI.
Scope and Contents note:

Muriatic Tank Car. Photographs by W. B. Banker

Dates: 1919 October 28

Boiler Plant, 1919 November 8-1935 July 1

 File — Box: 33, Folder: 9
Accession: 1982-300Identifier: 1982-300-XLVI.
Scope and Contents note:

Fuel Oil Installation for Boiler Plant Showing the Lay-Out of the Bottom of One of the 55,000 Barrel Storage Tank In the Background to the Left is the Type of Trees Which Have to be Removed to Make Room for these Tanks, Fuel Oil Installation for Boiler Plant Showing the Ground Work in Preparation for the 2 50,000 Gallon Storage Tanks at the Power House, Fuel Oil Installation for Boiler Plant Showing the Completion of the Second 50,000 Gallon Tank First Tank Alrady in Operation, Fuel Oil Installation for Boiler Plant Showing Excavations Made with Forms in Place to Receive Concrete Foundations for Foamite Pump House, Fuel Oil Installation for Boiler Plant Showing Forms Being Set for Foamite Pump House Located at Power House, Fuel Oil Installation for Boiler Plant Showing Foundations Completed and Forms in Place to Receive Concrete for Foamite Pump House Located at Beach, Fuel Oil Installation for Boiler Plant Showing Concrete Being Poured in Wall Forms at Foamite Pump House Located at Deepwater Point Pier, Fuel Oil Installation for Boiler Plant Showing Foamite Tanks Located at the 55,000 Barrel Tanks Foamite Station, Boiler House. Report by O. R. Ames. Photographs by J. E. Griffith, J. A. DeLuca, H. F. Webb

Dates: 1919 November 8-1935 July 1

Intermediate Stores Warehouse, 1919 November 10-1920 August 9

 File — Box: 33, Folder: 10
Accession: 1982-300Identifier: 1982-300-XLVI.
Scope and Contents note:

Showing General View from Top Floor of the Old Tetryl Nitrating House Picture Shows the Excavation for Foundation Which is About 50% Completed Concrete Forms can be Seen to the Right and Left of Picture Building Checked in the Backgreound is the Azo Grinding and Mixing House, Showing a View of the Forms of the First Two Sections, Showing Progress of Work on the Above Project with Insley Concrete Hoists in Place Photograph shows Southeast Corner of Structure, Showing Western Wall of Storehouse after Forms had been Removed, Showing Preparations Being Made to Pour Concrete in Forms of New Bays, Showing Steel Forms in Course of Erection on Fifth Bay, Showing Concrete Walls on 8 and 9 Bays Completed, Showing North End of Completed Intermediates Stores Warehouse Also Shows Section of Broad Gauge Track and Concrete Road. Photographs by J. E. Griffith, H. F. Webb

Dates: 1919 November 10-1920 August 9

Additional Electrical Facilities, 1919 November 10-1920 March 3

 File — Box: 33, Folder: 11
Accession: 1982-300Identifier: 1982-300-XLVI.
Scope and Contents note:

Showing the Progress Made Upon Installation of New switch Board on the Turbine Floor at the Power House, Showing Progress Made in Installation of Switch Board on the Turbine Floor of the Power House, Showing Concrete Tower Built to House TRansformers and Support High Tension Wires to Power House.

Dates: 1919 November 10-1920 March 3

Magenta Building, 1919 November 10

 File — Box: 33, Folder: 12
Accession: 1982-300Identifier: 1982-300-XLVI.
Scope and Contents note:

New Apparatus Magenta Building Check Shows Outside View of New Buliding. Photographs by J. E. Griffith

Dates: 1919 November 10