Skip to main content
Notice: The Library is open for research by appointment only, please visit our research services page for more information.

ULSAB Program Phase 2 Final Report to the ULSAB Consortium, 1998 March

 File — Box: 2, Folder: 15-16
Accession: 2747Identifier: 2747-I.-A.

Part of collection: WorldAutoSteel records (2747)

Dates

  • Creation: 1998 March

Scope and Contents

Porsche Engineering Services, Inc. Sections include: Executive Summary; Phase 2 Introduction; Phase 2 Package; Styling; Design and Engineering; CAE Analysis Results; Materials and Processes; Parts Manufacturing; DH Build; Testing and Results; Economic Analysis; Summary of Phase 2 Results.

Physical Description

Removed from binder for preservation purposes; binder has not been retained.

Physical Storage Information

Select the link below to view all items in this container

Extent

From the Collection: 10 Linear Feet

From the Collection: 20.5 Gigabytes

From the Collection: 6,104 digital_files

Language of Materials

From the Collection: English

Additional Description

Access Restrictions

No restrictions on access; this collection is open for research.

Related Names

Creator

Repository Details

Repository Details

Part of the Manuscripts and Archives Repository

Contact:
PO Box 3630
Wilmington Delaware 19807 USA
302-658-2400