Box 17

 Container

Contains 19 Results:

Projects 1564 and 1433, 1937 May 1

 File — Box: 17, Folder: 1
Accession: 1982-300Identifier: 1982-300-XIV.
Scope and Contents note:

Urea Plant, Hyper Compressors, Scrubbers, Power House, Mountain Aeration. Report and photographs by R. C. Reber.

Dates: 1937 May 1

Project 1063, 1451, 1564, 1618, 1766, 1937 October 4

 File — Box: 17, Folder: 2
Accession: 1982-300Identifier: 1982-300-XIV.
Scope and Contents note:

ZA-4 Plant, Strainers, Caustic Plant, Zerone Storage, Pile Cluster, Wharf Logs, Coal System, Aeration System, Acids Building, Urea Plant, Generator House, "B" Factory, Coke Plant, Power House Office. Report and photographs by R. C. Reber.

Dates: 1937 October 4

Construction Projects, 1937 October 25

 File — Box: 17, Folder: 3
Accession: 1982-300Identifier: 1982-300-XIV.
Scope and Contents note:

York Compressor, Mountain Aeration Release Tank #16 Line, Scrubbers, Zerone STorage, Main Office, "A" Liquefication, Thylox and Booster Area, acetic Acid and Distillation Area, Adipic Acid, Catalyst Preparation, Urea and Compressor Buildings. Report and photographs by R. C. Reber.

Dates: 1937 October 25

Construction Projects, 1937 October 25

 File — Box: 17, Folder: 4
Accession: 1982-300Identifier: 1982-300-XIV.
Scope and Contents note:

A Factory North Side Scrubbers, Mountain Aeration, 16 Inch Gas Line, Mount Aeration RElease Tanks 16 Inch Line, Zerone Loading, Addition to Main Office, A Liquidefaction, Addition to Thylox and Booster Area, Acids Distillation, Adipic Acid, 7 Foot by 88 Foot Scrubber B Pit, Addition to Catalyst Preparation, CO2 Composition Buliding, B Plant York Compressors. Report and photographs by R. C. Reber.

Dates: 1937 October 25

Construction Projects, 1938 January 29

 File — Box: 17, Folder: 5
Accession: 1982-300Identifier: 1982-300-XIV.
Scope and Contents note:

Office, Urea Area, CO2 Release Line, Adipic Acid Plant, High CO Equipment, Denaturing Plant and Still House, Acids Area, "A" Factory, Experiment Laboratory. Report and photographs by R. C. Reber.

Dates: 1938 January 29

Construction Projects, 1938 March 21

 File — Box: 17, Folder: 6
Accession: 1982-300Identifier: 1982-300-XIV.
Scope and Contents note:

Denaturing Plants and Still House, Pole Line Supports, Pipe Bridge, Acids Distillation Bulding, Acids Synthesising Building, CO2 Release Line, Experiment Buliding, Railroad Overhead Crossing, Alcohol Tank, Esters Plant. Report and photographs by R. C. Reber.

Dates: 1938 March 21

Project 2846, 3376, 3078, 1766, 2548, 3001, 1938 April 22

 File — Box: 17, Folder: 7
Accession: 1982-300Identifier: 1982-300-XIV.
Scope and Contents note:

Acids Distillation Building, Spillway from "B" Basin Mountain System, Filtered WAter Main, Esters Addition to Buliding #142, Acids Area Looking North, Synthesis Building, Storage Tanks up Simmons Creek, Acids Area Looking East. Report and photographs by R. C. Reber.

Dates: 1938 April 22

Project 1766, 2548, 3078, 1938 June 29

 File — Box: 17, Folder: 8
Accession: 1982-300Identifier: 1982-300-XIV.
Scope and Contents note:

Acids Distillation Tank Farm, Esters Plant, Acid Synthesis Building, Pipe Bridge. Report and photographs by R. C. Reber.

Dates: 1938 June 29

Construction Projects, 1938 October 4

 File — Box: 17, Folder: 9
Accession: 1982-300Identifier: 1982-300-XIV.
Scope and Contents note:

A and B Factory, Contact Conversion, Zerone Storage, ZA-4 Plant, Thylox Plant, Service Building, Office, Compressors, Power House, Filter Plant, Generator House, Benzol Plant, Coke Plant, Aeration System, Urea Plant Switchhouse, Caustic Plant, Formamide Plant, Wharf Dimethyl Sulfate, Gas Holder, Lactamol.

Dates: 1938 October 4

Projects 3667, 3558, 2547, 1766, 2548, 2934, 1938 November 9

 File — Box: 17, Folder: 10
Accession: 1982-300Identifier: 1982-300-XIV.
Scope and Contents note:

Uramon Bulk Loading Equipment, #16 Boiler, "A" Factory Ventilation, Acids Distillation Building, Tank Farm, Railroad Culvert at Simmons Creek. Report and photographs by R. C. Reber.

Dates: 1938 November 9

Project 3558, 3667, 2934, 1938 November 18

 File — Box: 17, Folder: 11
Accession: 1982-300Identifier: 1982-300-XIV.
Scope and Contents note:

Boiler House, Uramon Bulk Loading Equipment, Railroad Culvert over Simmons Creek. Report and photographs by R. C. Reber.

Dates: 1938 November 18

Project 3667, 3652, 2934, 3773, 1938 December 12

 File — Box: 17, Folder: 12
Accession: 1982-300Identifier: 1982-300-XIV.
Scope and Contents note:

Uramon Bulk Loading Equipment, Car Puller- CO2 Hyper Compresso Buliding, Nylon Plant Area, Railraod TRacks, Locomotive, Cyclohexanone Tank. Report and photographs by R. C. Reber.

Dates: 1938 December 12

Project 3652, 3667, 3558, 1939 January 30

 File — Box: 17, Folder: 13
Accession: 1982-300Identifier: 1982-300-XIV.
Scope and Contents note:

"AN" Intermediates Area, Repairs #16 Boiler. Report and photographs by R. C. Reber.

Dates: 1939 January 30

Project 3652, 1939 February 7-1939 May 22

 File — Box: 17, Folder: 14
Accession: 1982-300Identifier: 1982-300-XIV.
Scope and Contents note:

"AN" Intermediates Area. Report and photographs by R. C. Reber.

Dates: 1939 February 7-1939 May 22

Project 3652 and 2934, 1939 February 20-1939 May 4

 File — Box: 17, Folder: 15
Accession: 1982-300Identifier: 1982-300-XIV.
Scope and Contents note:

"AN" Intermediates Area, Rearrangement Railroad Tracks. Report and photographs by R. C. Reber.

Dates: 1939 February 20-1939 May 4

Project 3652, 2934, 4283, 1939 April 2

 File — Box: 17, Folder: 16
Accession: 1982-300Identifier: 1982-300-XIV.
Scope and Contents note:

"AN" Intermediates, Rearrangment Railroad Tracks, Fire House at River, Acid Still House. Report and photographs by R. C. Reber.

Dates: 1939 April 2

Project 3978, 3652, 4435, 3780, 1939 June 6

 File — Box: 17, Folder: 17
Accession: 1982-300Identifier: 1982-300-XIV.
Scope and Contents note:

Car Repair Shops, AN Intermediates, Car Spot, Works Laboratory, Glycol Plant. Report and photographs by R. C. Reber.

Dates: 1939 June 6

Projects 3978, 3979, 3652, 3780, 1939 June 26-1939 July 13

 File — Box: 17, Folder: 18
Accession: 1982-300Identifier: 1982-300-XIV.
Scope and Contents note:

Car Repair Shop, Salvage Building and Riggers Loft, AN Intermediates, Glycol Plant. Report and photographs by R. C. Reber.

Dates: 1939 June 26-1939 July 13

Project 4435, 3780, 3978, 3979, 3652, 1939 August 16

 File — Box: 17, Folder: 19
Accession: 1982-300Identifier: 1982-300-XIV.
Scope and Contents note:

Works Laboratory, Glycol Building, Car Repair Shops, AN Intermediates, Salvage Building and Riggers Loft. Report and photographs by R. C. Reber.

Dates: 1939 August 16