Construction division records
Part of collection: E. I. du Pont de Nemours & Company, Atomic Energy Division records (1957)
Dates
- From the Collection: Creation: 1942-1989
Scope and Contents
Subseries F contains the Construction Division records. These records include memoranda and correspondence relating to the Atomic Energy Commission contract and related subcontracts. These files document the DuPont Company's relationships with consultant architects, engineers, and the blue- and white-collar workforce. There are materials describing efforts to comply with the Davis-Bacon and Walsh-Healy Acts. Also included are monthly reports from subcontractors and AEC procedural memoranda relating to design and procurement. Construction Administrative records describe safety procedures and efforts at cost reduction. They contain statistical abstracts prepared by R. M. Waddell, which detail manpower involved in the various construction-job categories at Savannah River.
Extent
From the Collection: 80 Linear Feet
Language of Materials
From the Collection: English
Additional Description
Access Restrictions
This collection is open for research.
Related Names
Creator
- From the Collection: E.I. du Pont de Nemours & Company. Atomic Energy Division (Organization)
Repository Details
Repository Details
Part of the Manuscripts and Archives Repository